Cisart is on the way to completing the mechanical and electrical assembly of the anodizing plant in Alumet, the Netherlands, with its own team of specialists and the supervision of our site manager, who are assisted by our engineers in remote mode. This plant already shows its impressive structure and a special care in every detail, as a product of high technical performance and with a strong visual impact.
In the following next days we will complete the erection of six bridge cranes, three of which upgraded with fumes containment booths. Actually the alkaline and acidic fumes will be exhausted through a suction and treatment huge system from CISART’s production.
Our personnel are also finishing the assembly of the heating and cooling tanks lines on site.Upon the end of plant erection, we will install the plant automation system and finally we will arrange the first tests for the line commissioning.